Data center space is becoming increasingly scarce, delivery cycles are getting shorter and shorter, while the demand for uninterrupted power supply for critical loads continues to rise.
These three problems are superimposed together, and the traditional scheme of decentralized procurement and on-site integration will be obviously difficult: the equipment specifications are different, and the installation space of at least two cabinets is required; The construction involves multiple processes and the construction period is too long. At the same time, there are also safety and debugging risks brought about by cross-cabinet wiring.
North energy lithium battery UPS The integrated power cabinet presses this path into a standard cabinet body. Open the cabinet door, from top to bottom are the battery pack, high-voltage box,UPS The main engine, arranged in three sections, has been adjusted and tested with load when leaving the factory.
The product is 19 inch standard cabinet as the carrier, will UPS The main machine, high voltage box, lithium iron phosphate battery pack and fire fighting device are integrated in the same cabinet, and the capacity of a single cabinet can reach 65 Degree of electricity, insufficient floor space for a single unit 0.5 Square meter. The equipment is pre-installed and loaded in the factory, and the user completes it on site.The equipment is inserted into the cabinet,Input and output cables can be put into operation after wiring.

Illustration 1North Energy Lithium Battery UPS Integrated power cabinet whole cabinet real shot (8 Package configuration, cabinet door open state)
The cabinet is divided into three sections according to the power supply direction: the upper part is the battery pack area, the middle part is the high-voltage box, and the bottom part is UPS Host. The battery is on the top, the high voltage box is centered,UPS Nearby, DC side cables are routed in the cabinet all the way, and there is no need to lay across the cabinet.
Assembly, wiring, parameter matching and linkage debugging All are completed in the factory production line, and plug-in connection is adopted in the cabinet. The user site only needs to complete the input and output cable wiring, can be put into operation.
The product is divided into two branches of low voltage and high voltage according to the voltage level, covering 51.2V 至 512V The main voltage platform; battery pack capacity and backup duration are configured one-to-one according to load power and expected duration.

Illustration 2Three-section structure inside the cabinet
01| Provincial Choice
Standard 19 Inch cabinet, size 600(W)×800(D)×Highly customizable, the floor area of a single unit is insufficient 0.5 ㎡。
UPS The main engine, high-voltage box, lithium iron phosphate battery pack, and fire-fighting equipment are integrated in the same cabinet, and the capacity of a single cabinet can reach 65 Per kilowatt-hour.
The cabinet is clear three-stage type: the upper battery pack area is high 2000mm, Standard 8 Battery pack; Middle high voltage box; Bottom UPS Host. Not thatHigh and low size inconsistent equipmentThe child is stuffed into a shell, but is rearranged in order according to the power supply flow direction.——The battery is located at the top, with the high-voltage box positioned in the center.UPS Nearby, the DC side cable is finished in the cabinet and does not leave the cabinet.
The land occupied by four independent cabinets is merged into one, and the vacated ground can be reserved for equipment that really wants to run business. The width, depth and height of the cabinet can be selected as required, and can be neatly arranged with other equipment. The appearance color supports customization according to the color number, and it is not abrupt to put it into the existing equipment area.
02| Fast Delivery
UPS The main engine, lithium battery pack, high-voltage box, fire-fighting components and cables are pre-assembled in the factory, and plug-in connection is adopted in the cabinet.
The user site only needs to do one thing: complete the input and output cable wiring, can be put into operation. The processes of assembly, wiring, parameter matching and linkage debugging have all been moved forward to the production line.
The control and wiring terminals are centrally arranged inside the cabinet door, and the field wiring can be completed at the front side of the cabinet without going deep into the cabinet.
The bottom of the cabinet is equipped with a heavy-duty universal wheel, which can be shifted and adjusted by a single person under no-load condition without the aid of large-scale handling tools.
Already have UPS The computer room, can also only be equipped with lithium cabinet and the original host docking. The two paths of new construction and renovation shall be selected according to the site conditions.
03| The real security
Each battery pack is equipped with an aerosol automatic fire fighting device as standard, and has a fire signal tripping function, which can be linked with the overall fire fighting system of the machine room.
The front panel of each battery pack is equipped with an independent circuit breaker and status indication, and a single pack can be returned separately.——When a package needs to be overhauled or replaced, the rest of the battery packs continue to work, without the whole group shutdown.
Cabinet-mounted BMS Battery management system, using ACDC、DCDC Double circuit for the main control power supply,7×24 Hours of continuous monitoring of operating status.
Fire is independent BMS The second line of defense, the two do not replace each other.
04| Wide tolerance
The specifications of this lithium battery system are as follows.
Charging operating temperature range 0~+55℃Discharge operating temperature range -20~+55℃。
The above parameters are product design specifications, which can be consulted by reference to the supporting specifications. It is suitable for most indoor working conditions such as sultry equipment room, high load cabinet area and northern low temperature project.
Some cells are designed for sustainable discharge rates up 4C, adapt to heavy-duty power supply scenarios.
Ambient temperature is an important factor affecting the service life of lithium batteries. The wide working temperature range expands the range of working conditions that the product can adapt. Protection grade of cabinet body IP20Designed for interior use.
⚠️ Prompt: This protection level is not applicable to scenes with high dust, high humidity, outdoor and easy condensation. It is recommended to select and evaluate in advance for such working conditions, take additional protective measures or select cabinets with higher protection level.
05| Configuration Activity
Voltage platform coverage 51.2V 至 512V The main grade, battery pack on demand, backup duration 15 Minutes 8 Hours can be configured (specific load power and configuration scheme shall prevail).
Support phased deployment and later expansion: on the premise of qualified battery status, the old and new battery packs can be operated stably in parallel without replacing the whole cabinet.
On-demand increase, input rhythm can also be flexibly arranged——There is no need to spend the budget on the first day for the capacity in three years.
06| Docking Width
Cabinet door comes 7 Inch LCD screen,可View running data directly.
Communication Support CAN、RS485、Modbus, dry contacts and other ways, can be with mainstream brands UPS And the dynamic ring monitoring platform docking.
If customization is required UPS Agreement, the equipment can be sent to the factory for commissioning, the two sides can sign a confidentiality agreement, the customer and equipment information according to the agreement protection.
07| proof of strength
CompanyState Grid Shaanxi Electric Power Co., Company 9 A bid, and continuous supply.
Products exported overseas, service overseas data centers; domestic high-speed, schools, industrial park rooms have landed cases.
08The weight of commitment
Lithium Battery Warranty 5 Year, warranty terms can be written into the contract.
Relying on 13 Years of industry experience and own factory production lines, urgent orders can be prioritized (depending on the current capacity scheduling); A full set of operation videos are attached with the order, and installation and daily operations are well documented.
During working hours, after consultation 20 The configuration scheme is issued within minutes.
The end
OEM / ODM Long term open, welcome UPS Brand side to discuss cooperation.
If you need a plan, it is enough to provide three pieces of information:Load power · Expected power-up duration · On-site voltage level。
ContactTel:189 1123 7326

Illustration 3Consultation and Information Request (WeChat QR Code)
(Data and statement:The cabinet size, capacity, voltage, temperature, magnification, protection grade, warranty period, service aging and other data involved in this article are based on the Company's product technical data and the implementation of the project. The fire protection configuration and linkage function shall be implemented in conjunction with the overall fire protection system of the machine room, and the relevant acceptance shall be subject to meeting the current fire protection specifications of the project location.)